The short version
- Slurry spread as fertiliser is not waste. Waste law excludes manure and other natural farm material "used in farming".
- Your slurry could become waste. The farm exclusion does not cover manure "destined for … use in a biogas or composting plant". Once it is heading for AD, the ordinary waste tests apply — and how the plant is set up can decide the answer.
- Digital waste tracking is live. Since 1 October 2026 in England and Wales, any site with an environmental permit that receives waste must record every load within two working days. Scotland and Northern Ireland follow on 1 January 2027.
- Exempt-only farms are not in phase one. If you only work under registered waste exemptions, this first phase does not catch you.
- Waste transfer notes haven't gone away. Anything you pass on as waste still needs a written description, kept for two years.
- Not sure? Ask the regulator — Environment Agency, NRW, SEPA or NIEA — before the first load, not after.
Is slurry waste?
Spread on land as fertiliser: no
The Waste Framework Directive, still part of UK law, lists what it does not cover. That includes "faecal matter … straw and other natural non-hazardous agricultural or forestry material used in farming, forestry or for the production of energy from such biomass through processes or methods which do not harm the environment or endanger human health" (Article 2(1)(f)).
So the everyday job — store to tanker to field, as fertiliser — sits under the farming rules (NVZ, Farming Rules for Water, SSAFO and their equivalents), not under waste law.
Going into a biogas or composting plant: the exclusion doesn't apply
The faecal matter exclusion only applies "if not covered by paragraph 2(b)". Paragraph 2(b) deals with animal by-products — which include manure — and it carves out "those which are destined for incineration, landfilling or use in a biogas or composting plant".
In plain English: once slurry is heading for an AD plant, the farm exclusion stops protecting it. That does not automatically make it waste. It means the ordinary question applies — is it being discarded, or is it a by-product being used? That is a judgement on the facts, and the regulator makes it.
Nothing in the wording turns on whose land the AD plant is on. We have not found official guidance that says slurry from the same holding is, or is not, waste when it goes into the farm's own AD plant.
One to watch: slurry into farm AD plants
If your slurry goes to an AD plant — even your own
The NFU lists AD plants among the farm businesses likely to be affected by digital waste tracking, and says "Farms receiving waste from 3rd parties under permits or licences must comply" (25 September 2026).
Where the AD plant is run as a separate business from the farm, it is fair to ask whether slurry going in from the farm counts as a waste input to that business — even if the store and the digester sit on the same holding. We have not found an official answer that covers every case.
Scotland — draft guidance: SEPA's draft guidance on non-waste anaerobic digestion (Approved Draft, August 2026) says "Typical waste inputs to an AD plant could include manure and slurry", and that if a plant accepts any waste feedstock it "will be regulated as waste AD, regardless of the type, quantity or proportion of waste feedstock used." It is still a draft: SEPA's engagement closed on 11 October 2026, its timeline shows the final guidance due on 1 December 2026, and the new authorisation is needed from 1 April 2028. We did not find anything in it on whether slurry from the same holding, or from a separate business, is treated differently.
Questions worth putting to your regulator:
- Who owns and runs the AD plant — the farm business, or a separate company?
- Does the plant hold an environmental permit?
- What else does it take in besides your slurry?
- Does slurry change hands, or get paid for, on its way in?
What we'd do: if your AD plant holds an environmental permit, ask your regulator in writing whether the slurry and manure it takes in are waste inputs, and whether they need recording in the digital waste tracking service. Keep the reply. If they are, every load needs recording within two working days of arrival.
Digital waste tracking: who, what, when
Permitted sites that receive waste
The Digital Waste Tracking (England) Regulations 2026 and the Digital Waste Tracking (Wales) Regulations 2026 both came into force on 1 October 2026. The duty falls on the operator of a permitted facility who receives controlled waste there.
- What: a record of each load in the government's digital waste tracking service — who sent it, who carried it, what it is (waste code), how much, and what happens to it.
- When: by "the end of the second working day after the day on which the load" is received.
- Cost: £26 a year per organisation — one fee covers all of your waste-receiving sites. The first payment is due by 31 January 2027.
- No internet? Operators who are "digitally excluded" keep a written record instead, within the same two working days.
Signing up (GOV.UK, "Report receipt of waste"): create a Defra account using your business's Government Gateway or GOV.UK One Login — not a personal account. Then send records either through compatible waste software or by filling in Defra's template spreadsheet. You can't use your own spreadsheet or change the template.
The NFU warns that businesses that don't comply "could face enforcement notices, fixed or variable monetary penalties and even criminal prosecution".
Scotland and Northern Ireland follow in January
The Digital Waste Tracking (Scotland) Regulations 2026 come into force on 1 January 2027, with the same two-working-day rule and £26 fee for permitted sites. NetRegs says phase one becomes mandatory in Northern Ireland in January 2027 as well.
Exempt sites, and hauliers
Defra: "Waste exemptions are not included as the first phase, as it only applies to permitted sites that receive waste." If your farm only runs registered exemptions (for example spreading under an exemption), phase one does not catch you.
Phase two brings in waste carriers, brokers and dealers — mandatory from October 2027, according to Defra's policy paper. The NFU describes it as phase two "for smaller sites" from 1 October 2027.
Waste transfer notes: still needed
Anything you pass on as waste
The duty of care applies to anyone who produces, carries, keeps, treats or disposes of controlled waste in England or Wales. Digital waste tracking does not replace it. Before you hand waste over, check the next person is authorised — a registered carrier, or a site with a permit or registered exemption — and agree a written description (the transfer note).
- What it says: the waste code, how much, what it is and how it's contained, when and where it changed hands, both parties' names, addresses and authorisation numbers, and a line confirming you applied the waste hierarchy.
- Keep it: two years for non-hazardous waste; three years for hazardous waste consignment notes.
- Regular loads: a "season ticket" can cover a run of the same waste with the same carrier for up to a year.
Septic tank sludge, haulage and the mixed-load trap are covered in our sludge and septic tank guide. Scotland and Northern Ireland: see NetRegs' duty of care guidance.
What to do now
- Only spreading your own slurry as fertiliser? Nothing new from waste law. Keep your nutrient and NVZ records as usual.
- Hold an environmental permit and take anything in from outside? You are in phase one. Register with the digital waste tracking service and record every load within two working days.
- Run an AD plant as a separate business? Ask your regulator, in writing, whether the farm's slurry going in is a waste input.
- Only work under registered exemptions? Not in phase one — but keep good records; later phases are planned.
- Sending waste off the farm? Registered carrier, transfer note, kept for two years.
Sources: Waste Framework Directive 2008/98/EC, Article 2 (UK retained version); Digital Waste Tracking (England) Regulations 2026 (SI 2026/729, regulations 4, 5 and 8); Digital Waste Tracking (Wales) Regulations 2026 (WSI 2026/105); Digital Waste Tracking (Scotland) Regulations 2026 (SSI 2026/145); Defra, Digital waste tracking service policy paper (updated 1 October 2026); NetRegs, Digital waste tracking; GOV.UK, Waste duty of care: code of practice; GOV.UK, Report receipt of waste (updated 25 September 2026); NFU, Digital Waste Tracking: essential information (25 September 2026). SEPA, EASR draft guidance: Schedule 26 non-waste anaerobic digestion (Approved Draft, August 2026, pages 4 and 12) and engagement page. This is a plain-English summary, not legal advice — always check with your regulator. Last reviewed 30 October 2026.