Every part of the UK sets a legal minimum for slurry storage, and they are not the same. Here is what each nation requires — how much, how it must be built, who you tell before you build — taken from the regulations themselves, with the official wording where a figure or a date matters.

Last reviewed: 29 October 2026. Also see: how much storage do I need?, how to need less storage, storage types compared, planning permission for slurry stores and what to do if a store leaks or spills.

The short version

  • England: at least 4 months on every farm. Inside an NVZ, 1 October to 1 March for cattle, sheep and other livestock and 1 October to 1 April for pigs and poultry. The Environment Agency recommends 6 months for everyone.
  • Wales: the same 1 October – 1 March and 1 October – 1 April periods, but on every farm in the country, not just NVZs.
  • Scotland: 22 weeks for housed cattle, 26 weeks for housed pigs — every farm, since 1 January 2026.
  • Northern Ireland: at least 22 weeks, or 26 weeks for a pig or poultry enterprise.
  • Everywhere: the store must hold the rain and washings that get into it as well as the slurry, and keep 750 mm freeboard (earth-walled) or 300 mm (anything else) — which doesn't count as capacity.
  • Tell the regulator first — 14 days (England, Wales), 30 days (Scotland) or 28 days (Northern Ireland). Details below.

Side by side

The headline legal requirements. Each nation's section below has the detail and the source.

EnglandScotlandWalesN. Ireland
Main lawSSAFO Regulations 2010; NVZ: Nitrate Pollution Prevention Regulations 2015Environmental Authorisations (Scotland) Regulations 2018, general binding rules; NVZ Regulations 2008Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021Nutrients Action Programme Regulations (NI) 2019
Minimum capacity4 months (all farms). NVZ: 1 Oct–1 Mar, or 1 Oct–1 Apr for pigs and poultry22 weeks housed cattle; 26 weeks housed pigs1 Oct–1 Mar; 1 Oct–1 Apr for pigs and poultry22 weeks; 26 weeks for a pig or poultry enterprise
Applies toAll farms; NVZ periods inside NVZsAll farms (non-NVZ farms since 1 Jan 2026)All farms (capacity duty since 1 Aug 2024)All farms
Freeboard750 mm earth-walled · 300 mm all other stores — in all four nations
Distance from water10 m from inland freshwaters or coastal waters10 m from surface water or a surface water drain (stores built from 1 Jan 2022)10 m from inland freshwaters or coastal waters10 m from any waterway; 50 m for above-ground tanks started after 31 Dec 2019
Design life20 years with maintenance20 years (built from 1 Jan 2022)20 years with maintenance20 years
Tell the regulatorEnvironment Agency, 14 days before works startSEPA, 30 days before works startNRW, 14 days before works startDAERA, 28 days before first use
Old-store exemptionPre-1991 stores (construction rules only)Ended 1 Jan 2022 for the design rulesPre-1991 stores (construction rules only)Stores completed before 1 Dec 2003
Separator counts?No — must meet the minimum without itNot addressed in the ruleGuidance allows a reduction if always usedSeparated solids from non-pig slurry count

England

Two layers: the SSAFO rules apply to every farm; the NVZ rules add longer periods inside a Nitrate Vulnerable Zone. The Farming Rules for Water then govern how and when it comes out.

In forceEnglandSSAFO 2010

Capacity: 4 months on every farm

Under the Water Resources (Control of Pollution) (Silage, Slurry and Agricultural Fuel Oil) (England) Regulations 2010, a store must have "adequate storage capacity for the likely quantities of slurry". Where slurry is going to be spread on land, it needs to hold the most slurry produced in "any four month period". GOV.UK puts it simply: "You'll normally need capacity for at least 4 months' slurry storage."

The store must also allow for "the likely quantities of rainfall (including snow, hail or sleet)" getting in. The Environment Agency recommends 6 months for everyone to stay clear of the Farming Rules for Water (it restated this in July 2026) — a recommendation, not the legal minimum.

In forceEngland · NVZNVZ Regulations 2015, reg 25

Inside an NVZ: 5 or 6 months

Regulation 25 of the Nitrate Pollution Prevention Regulations 2015 requires storage for all slurry produced on the holding, and all poultry manure produced in a yard or building, over the storage period: "in the case of pigs and poultry, the period that begins with 1st October and ends with the following 1st April; in any other case, the period that begins with 1st October and ends with the following 1st March."

The store must hold, on top of the manure, "any rainfall, washings or other liquid that enters the vessel (either directly or indirectly)". GOV.UK says to allow for a wetter-than-average (1 in 5) year.

You don't need storage for manure you intend to send off the holding, or to spread on low run-off risk land (average slope under 3°, no land drains other than sealed pipes, and at least 50 m from a watercourse). If you rely on low run-off risk land, you must still have storage for "an additional one week's manure" as a contingency. If you send slurry off the holding, you must record where it went and "details of a contingency plan" in case the arrangement fails — see moving slurry between farms.

In forceEnglandSSAFO Schedule 2

How it must be built

  • Base and walls impermeable, protected against corrosion and built to take the loads, to BS 5502: Part 50: 1993.
  • Built to last at least 20 years with proper maintenance.
  • Not within 10 metres of inland freshwaters or coastal waters that slurry could reach if it escaped, unless the Environment Agency agrees in writing.
  • Freeboard: at least 750 mm for an earth-walled store, 300 mm for any other.
  • Any drainage pipe from the store needs two valves in series at least 1 metre apart, kept shut and locked when not in use.
  • A reception pit or temporary store must hold at least two days' production.
  • Earth-banked stores: GOV.UK sets out the soil or liner standard (at least 1 m of suitable compacted soil, or a liner).
In forceEnglandOnline form since 26 Jan 2026

Telling the Environment Agency

Regulation 9 requires notice of the type of store and its location "at least 14 days before work constructing the new or improved store is to be begun". It covers stores whose construction began on or after 15 June 2013, and "construction" includes substantial enlargement and reconstruction. GOV.UK says the same: notify the Environment Agency at least 14 days before you build new storage or make substantial changes. An online notification form was added on 26 January 2026.

In forceEnglandSSAFO reg 6

Old stores (pre-1991)

A store that was in use for slurry before 1 March 1991 — or built, or contracted for, before then and finished before 1 September 1991 — is exempt from the construction rules. It stops being exempt if the Environment Agency serves a notice requiring improvements that is not complied with, or (GOV.UK) "if you make substantial changes, for example structural changes, increasing capacity or relocating your store". The exemption covers how the store is built, not how much it holds: inside an NVZ the capacity rule applies regardless.

In forceEnglandGOV.UK guidance

Separators don't count towards the minimum

GOV.UK: "You must have enough storage to meet these requirements without the separator." The liquid that comes out "will remain slurry". Separated stackable solids must be kept on an impermeable surface and not in an uncovered field heap except briefly before spreading; "If material does get wet again, you must store and manage it as slurry." A separator can ease pressure once you already meet the minimum.

Scotland

Since 1 November 2025 the rules sit in the Environmental Authorisations (Scotland) Regulations 2018 as general binding rules, replacing the old CAR rules. If you meet them you don't need to apply to SEPA for an authorisation.

In forceScotlandAll farms since 1 Jan 2026

Capacity: 22 weeks cattle, 26 weeks pigs

SEPA's general binding rule on the storage of slurry requires capacity for "the total quantity of slurry likely to be produced in" 26 weeks by housed pigs or 22 weeks by housed cattle, worked out with the formula in regulation 7(2) of the NVZ (Scotland) Regulations 2008. The total must include rainfall "(including any fall of snow, hail or sleet)" getting in — including from dungsteads, silage pits or dirty yards — cleaning water, imported slurry or digestate, and any slurry exported off the farm.

Farms outside NVZs had until 1 January 2026 to comply; that transition has ended, so the rule applies to every farm. Inside an NVZ, NetRegs also lists 26 weeks for poultry manure unless it is kept in a temporary field heap.

If you import slurry you need room to hold it through periods when you can't spread it. Any reception or temporary store must hold at least 1.5% of your minimum on-farm capacity.

In forceScotlandEASR general binding rule

How it must be built

  • Base and walls impermeable and free of cracks; kept free of structural defects for their whole life.
  • Freeboard: at least 750 mm on earth-walled systems, 300 mm on others.
  • Two valves in series on drainage pipes, shut and locked when not in use.
  • Work done since 1 September 1991: corrosion protection and loads to BS 5502-50:1993+A2:2010.
  • Built, rebuilt or enlarged since 1 January 2022: a life expectancy of at least 20 years; earth-walled stores need an impermeable sheet liner lasting 20 years; and not within 10 metres of surface water or a surface water drain opening that slurry could reach.
  • Slurry bags: impermeable, inside a lined bund at least as big as the bag.
In forceScotland30 days' notice

Telling SEPA, and old stores

Give SEPA notice of construction, substantial rebuilding or enlargement "no later than 30 days prior to commencing the works", with an engineering plan. Keep the engineer's sign-off certificate for the life of the store and show it to SEPA on request.

NetRegs: "From 1 January 2022, pre-1991 systems are no longer exempt" from the design requirements such as an impermeable base and two valves.

Wales

The Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021 apply to the whole of Wales. The storage capacity duty was the last part to land, on 1 August 2024.

In forceWales2021 Regulations, reg 29

Capacity: 1 October to 1 March, or 1 April for pigs and poultry

You need storage for all slurry produced on the holding, and poultry manure from yards and buildings, over "the period between 1 October and 1 April for pigs and poultry" and "the period between 1 October and 1 March in any other case" — both inclusive. That is 5 months for cattle and other livestock and 6 months for pigs and poultry. The store must also hold "any rainfall, washings or other liquid that enters the vessel (either directly or indirectly)".

As in England, you don't need storage for manure sent off the holding or spread on low run-off risk land; if you rely on low run-off risk land you must keep an extra week's storage. The Welsh Government's FAQs say to work out your capacity on or before 1 October each year, using the stock you expect, and to recalculate within a month of a change.

In forceWalesSchedule 6; reg 32

How it must be built, and telling NRW

  • Freeboard: 750 mm earth-walled, 300 mm others.
  • Not within 10 m of inland freshwaters or coastal waters unless NRW agrees in writing.
  • Built to last at least 20 years; BS 5502: Part 50: 1993; two valves at least 1 m apart; two days' temporary storage.

Notice: give Natural Resources Wales the type and location of the store "at least 14 days before work constructing the new or improved store is to be begun". This includes substantial enlargement and reconstruction.

In forceWalesreg 26; WG guidance 2023

Old stores and separators

Stores in use, built or contracted before 1 March 1991 and finished before 1 September 1991 are exempt from the construction rules. Welsh Government guidance: "A pre 1991 store may be used if it does not pose a significant risk of causing pollution" — but it must still provide the capacity.

Unlike England, the Welsh guidance says that if you always use a mechanical separator you may reduce the storage you need, by about 15–20% for cattle slurry and 5–10% for pig slurry. The separated liquid is still slurry.

HorizonWalesNo dates

A review of storage design guidance

In a written statement of 8 October 2025 the Welsh Government said it would take forward all 23 recommendations of the review of the regulations, including a review of industry guidance on best practice for slurry storage, with CIRIA, to inform future store designs. Substantive changes to the rules would need formal consultation. No dates have been given.

Northern Ireland

The Nutrients Action Programme Regulations (Northern Ireland) 2019 apply to every farm. A new programme for 2027–2030 has been consulted on but not yet made.

In forceNorthern IrelandNAP 2019, regs 17–18

Capacity: 22 weeks, or 26 with pigs or poultry

Storage must be "sufficient for at least 22 weeks storage". A holding with a pig or poultry enterprise needs at least 26 weeks — unless it has fewer than 10 breeding sow places or 150 finishing pig places, and fewer than 500 poultry places, in which case 22 weeks applies. On a mixed farm, the pig or poultry side needs 26 weeks and the rest 22. You must also consider whether you need extra room for prolonged wet weather or frozen ground.

Regulation 23 lets some things count towards capacity: farmyard manure stored before spreading, solids taken out of non-pig slurry by a separator, storage you rent off the holding, and contracts with manure processing or approved treatment outlets. Out-wintered stock can reduce the storage needed, subject to conditions.

In forceNorthern IrelandSchedule 6; reg 19

How it must be built, and telling DAERA

  • Freeboard: not less than 750 mm earth-walled, 300 mm others. Allow for likely rainfall over the maximum storage period.
  • Not within 10 metres of any waterway slurry could reach — 50 metres for an above-ground slurry tank whose construction started after 31 December 2019 — unless the Department agrees in writing that adequate precautions are in place.
  • Built to last at least 20 years; corrosion protection to BS 5502-50:1993+A2:2010.

Notice: for a store built, substantially enlarged or reconstructed since 1 December 2003, tell the Department the type and location "at least 28 days before it is to be first used". GOV.UK's Northern Ireland page says to notify the Northern Ireland Environment Agency (NIEA).

Old stores: a store completed before 1 December 2003 is exempt from the construction rules, but loses that if it is substantially enlarged or reconstructed, or if a notice requiring works is not complied with.

Consultation closedNorthern IrelandClosed 7 Sep 2026

The next NAP may bring cover rules

DAERA's consultation on the Nutrients Action Programme 2027–2030 closed on 7 September 2026; no outcome has been published. Its impact assessment proposes that new above-ground stores have a fitted cover, roof or lid. That is a proposal, not law. See the regulation tracker.

Do I have to cover my store?

In forceEnglandEA guidance 9 Oct 2026

Only in some cases, for now

Permitted intensive pig and poultry units in England must cover slurry stores and lagoons, or use an acidification system instead (Environment Agency permit guidance, 9 October 2026). Grant-funded stores usually carry a cover condition. For everyone else, no nation currently requires covers by law — the Clean Air Strategy's proposal to cover all stores by 2027 has no law, consultation or date behind it. A cover also keeps rain out, which saves capacity — see how to need less storage.

Solid manure in field heaps

Not slurry, but it is storage, and the rules catch people out.

NationMain rules for a temporary field heap
England
NVZ
Not in a field liable to flood or become waterlogged; not within 50 m of a spring, well or borehole or 10 m of surface water or a land drain (other than a sealed pipe); not in one place for more than 12 consecutive months; not where one was in the last two years; not on a slope of 12° or more within 30 m of surface water. Unbedded poultry manure must be covered. Outside NVZs the Farming Rules for Water apply: not within 10 m of inland freshwaters or coastal waters, 50 m of a spring, well or borehole, or anywhere with a significant risk of pollution.
WalesNot within 50 m of a borehole, spring or well or 10 m of surface water or a land drain; not in one place for more than 12 consecutive months; not where one was in the last two years; not within 30 m of a watercourse on land the risk map shows as steeper than 12°. Unbedded poultry manure must be covered.
Northern IrelandFarmyard manure in a compact heap, not in the same spot in consecutive years; not within 20 m of any waterway (including open field drains), 50 m of a borehole, spring or well, or 250 m of a borehole used for public water supply; not on waterlogged or flood-prone land; spread within 120 days of placing it in the field.
ScotlandWe have not yet confirmed the current field-heap wording under the 2025 rules. Check SEPA's general binding rules or NetRegs before siting a heap.

Quick answers

Is the "6 months for cattle, 8 for pigs" figure the law?

No. That is the standard England's Slurry Infrastructure Grant asked you to build to. The legal minimums are set out above.

Do the Farming Rules for Water set a storage size?

Not directly. They require you to spread to crop and soil need, and the Environment Agency treats running out of storage as no excuse for spreading. That's why it recommends 6 months.

I rent storage on a neighbour's farm. Does it count?

Northern Ireland's regulations say rented off-holding storage counts. In England and Wales, slurry you send off the holding doesn't need storing, but you must record where it goes and a contingency plan in case the arrangement fails. In Scotland, slurry to be moved off the farm may be left out of the storage calculation. See moving slurry between farms.

Got a question this page didn't answer?

Ask us — you don't need to give your name, and every message is read by a person. Spotted something out of date? Tell us that too and we'll check and fix it.

A plain-English summary, not the regulations. Always check the official source or ask your regulator before you build or change a store. Where the regulation and the official guidance word something differently, we say so in italics.

Sources: England — SSAFO Regulations 2010 (SI 2010/639), regulations 4, 6 and 9 and Schedule 2; Nitrate Pollution Prevention Regulations 2015 (SI 2015/668), regulations 23–25 and Schedule 1; Farming Rules for Water (SI 2018/151), regulation 9; GOV.UK Storing silage, slurry and agricultural fuel oil (updated 26 January 2026), Storing organic manures in NVZs and Using a mechanical slurry separator; Environment Agency blog, 27 July 2026; Environment Agency, Intensive pig and poultry farming: how to comply with your permit (9 October 2026). Scotland — SEPA, The storage of slurry general binding rule; Environmental Authorisations (Scotland) Regulations 2018, Schedule 9; NVZ (Scotland) Regulations 2008, regulation 7; NetRegs, Scotland NVZs and rules for storing slurry. Wales — Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021 (WSI 2021/77), regulations 26, 27, 29 and 32 and Schedule 6; Welsh Government guidance for farmers and land managers (October 2023) and FAQs; written statement of 8 October 2025. Northern Ireland — Nutrients Action Programme Regulations (NI) 2019 (SR 2019/81), regulations 17–20 and 23 and Schedule 6; GOV.UK new or changed storage systems (NI); DAERA NAP 2027–2030 consultation. Last reviewed 29 October 2026.